Chemtop 1000 EPU
4-component, self-levelling epoxy based flooring system
Product Description
Application

Hygiene

Surface Protection

Dust Prevention

Chemical Resistance and Aesthetic Appeal
Product Contents
| Component | Appearance |
|---|---|
| Epoxy PU Hybrid Resin | Hazy, liquid |
| Hardener | Transparent, liquid |
| Manufactured Aggregates | White powder |
| Pigment Colour Concentrate | RAL colour paste |
For available RAL colours, refer current Chemsol Flooring and Topping shade card. Some colour variations may occur due to backfilling with sand in the case of bright colours. Under direct sunlight, there may be some discolouration and colour variation over time.
Salient Features
- Excellent self-leveling properties
- Pleasing Aesthetic Appeal due to Glossy, colourful Finish
- Superior Adhesion to Concrete
- Outstanding Mechanical Strength and Abrasion Resistance
- Good Resistance to Commonly Used Cleaning Chemicals
- Longer Gloss Retention
- Value for Money
Chemical Resistance
Mechanical /Physical properties
| Property | Test Method | Value and Unit |
|---|---|---|
| Mixing Ratio | NA | Pre-weighed kit to cover 11–13 sq.m area @ 1000 micron thickness |
| Finish | CPI* 1001 | Non-porous, Smooth, Glossy |
| Pot Life @ 30°C | CPI 1002 | 30–35 minutes |
| Surface Dry | CPI 1002 | 3 Hours |
| Hard Dry [Open for Foot Traffic] | CPI 1002 | 24 Hours |
| Full Cure [Vehicular Movement] | CPI 1002 | 72 Hours |
| Compressive Strength | ASTM C 579 | >600 Kg/cm² |
| Flexural Strength | ASTM C 580 | >450 N/mm² |
| Tensile Strength | ASTM C 307 | >150 N/mm² |
| Pull-off Adhesion Test | ASTM D 4541 | Concrete Failure |
| Abrasion Resistance [Taber] | ADTM D 4060 | 45–55 mg loss |
| Elongation at Break | ASTM D 638 | 15–20% |
| Service Temperature | CPI 1122 | 0–50°C |
| Shelf Life | — | 12 months in original unopened container when stored between 10–30°C |
Method of Application
Application conditions

Substrate temperature: 10-40 °C

Substrate moisture content: - <5%

Relative humidity: 8o%max
*Note: The substrate temperature must be at least 3 °( above the prevalent dew point temperature to reduce chances of condensation on the floor.
Substrate Quality
Substrate Preparation
Concrete substrates must be prepared mechanically using abrasive blast cleaning, scarifying, or grinding equipment to remove cement laitance and achieve an open-textured surface. Remove weak concrete ar expose surface defects such as blowholes ar voids. Repairs to the substrate, filling c blowholes/voids, and surface levelling must be carried out using appropriate products. Ensure that the dust, loose and friable material completely removed from all surfaces by brush or vacuum before application of the product.
The concrete substrate has to be primed or levelled with Chemprime in order to achieve an even surface. Allow the primer to cure for 5-6 hours. After this, depending on the system selected either apply a screed coat followed by a top coat
Mixing
Curing Schedule
| Temp. (°C) | Foot traffic | Full cure |
|---|---|---|
| 10°C | 48 hours | 120 hours |
| 20°C | 36 hours | 96 hours |
| 30°C | 24 hours | 72 hours |
Cleaning of Tools
Packing
Storage Conditions
Handling & Safety
*Disclaimer: The Information provided is based on our experience, thorough investigations & sophisticated testing methods, but due to the vast number of applications and usage methods, Chemsol Polymer Industries cannot accept responsibility of any kind for any particular result. It is the responsibility of the user to verify the suitability of the product for their end use and in accordance with the rules and regulations of that country /territory. All information provided pertaining to our products should be treated only as a guidance tool without any guarantee or warranty of any sort.
* All CPI test methods are our scientifically designed internal test methods which can be shared upon request.






