Chemqua1000 SL
4-component, self-leveling, water-thinnable epoxy system
Product Description
Uses
- New concrete slabs with high humidity
- Concrete floors with moisture-related issues
- It can also be used as a sealer coat for dust-proofing applications.
- slabs without a damp-proof membrane and a risk of rising moisture
- Places where chemical odour occurs during application are unacceptable.
Salient Features
- 12months from the date of manufacturing if stored properly in undamaged seal packaging, at a temperature between 5°C-30°C.
- It should be kept in a cool, well-ventilated area, away from heat, direct sunlight, sparks and children.
Chemical Properties
| Property | Test Method | Value and Unit |
|---|---|---|
| Mixing Ratio | NA | Pre-weighed kit |
| Surface Finish | CPI 1001* | Porous, Smooth, Satin |
| Pot Life @ 30°C | CPI 1002 | 30–35 minutes |
| Surface Dry | CPI 1002 | 4–5 hours |
| Hard Dry [Open for Foot Traffic] | CPI 1002 | 24 hours |
Technical information
| Property | Test Method | Value and Unit |
|---|---|---|
| Compressive Strength | ASTM C 579 | >330 Kg/cm² |
| Flexural Strength | ASTM C 580 | >170 Kg/cm² |
| Tensile Strength | ASTM C 307 | >80 Kg/cm² |
| Pull-off Adhesion Test | ASTM D 4541 | Concrete Failure @ 18 Kg/cm² |
| Abrasion Resistance [Taber] | ADTM D 4060 | 60 mg loss |
| Shore Hardness | ASTM D 2240 | D 80 |
| Shelf Life | — | 12 months in original unopened container when stored between 5–40°C |
| Vapour Permeability | ASTM E96:90 | 5–40°C |
| Fire Resistance | — | 15–20 gm/m³/mm/24 hr; BS476-7:1987 Class 1 surface spread of flame |
Method of Application
Application conditions

Substrate temperature: 10-40°C

Substrate moisture content: - It can be applied on green or damp concrete, provided there is no standing water/ponded water, but it is recommended to wait for 72 hours after casting the cement so as to allow the concrete to shrink, so that the cracks generated in concrete during shrinkage are not carried to the epoxy coating.

Relative humidity: 8o%max
Substrate Quality
Substrate Preparation
Mixing
Stir the resin part mechanically. Add colour paste into resin and mix till a uniform colour is achieved. Add hardener to this mixture and stir continuously for 2 minutes until a homogeneous mass is obtained. Add aggregates to this mixture and continue stirring for a further 3 minutes with a motorised helical paint stirrer until a uniform mix has been obtained. Overmixing must be avoided to minimise air entrainment.
Note that the mixture has a stipulated pot life, hence the laying should immediately commence after mixing the contents.
Curing Schedule
| Temp. (°C) | Foot traffic | Full cure |
|---|---|---|
| 10°C | 48 hours | 12 Days |
| 20°C | 36 hours | 8 Days |
| 30°C | 24 hours | 6 Days |
Cleaning of Tools
Packing
Storage Conditions
Handling & Safety
*Disclaimer: The Information provided is based on our experience, thorough investigations & sophisticated testing methods but due to vast number of applications and usage methods Chemsol Polymer Industries cannot accept responsibility of any kind for any particular result. It is the responsibility of the user to verify the suitability of the product for their end use and in accordance with the rules and regulations of that country /territory. All information provided pertaining to our products should be treated only as a guidance tool without any guarantee or warranty of any sorts.
* All CPI test methods are our scientifically designed internal test methods which can be shared upon request.